St Peter's Hall
What have we completed so far?
- External decoration to the door and windows at the front.
- A door has been inserted into the side wall for off-the-road access.
- Re-ordering & provision of disabled toilets.
- A new boiler has been fitted for the heating system.
- The 5 windows at the back of the Hall have been replaced with double glazed units.
- Decorating the walls and ceiling.
- External wall capping.
- Drainpipe and guttering repairs.
|
|
 |
What is still to be done?
The total cost, when completed is expected to be in the region of £45,000.
| ------------------------------------------------------------------------------------------------------------------------- |